As an experienced HVAC contractor, Blue Box Engineering knows the nuts and bolts of HVAC systems. we have participated in the construction of many commercial/office buildings, hospitals, factories, computer rooms.
For each heating, cooling, ventilation installation, we abide by the following guidelines in the design and installation of the HVAC system, ensuring optimal results.
- Determine or assess room-by-room loads and air-flows.
- Layout duct system and liquid circuits on floor plan, accounting for the direction of joists, roof hips, fire-walls, and other potential obstructions. Determine register locations and types, duct lengths, and connections required to produce layout given construction constraints.
- Size duct/water system.
- Select and size HVAC equipment to sensible load.
- Install equipment and ducts/liquid circuits according to design specifications, ensuring installation and safety procedures.
- Charge the system appropriately, and verify charge with the evaporator superheat method or sub-cooling method (or substantially equivalent).
- Check for proper furnace burner operation and fire-box drafting, if any.
- Test the system to ensure that it performs properly by determining (1) that the system is properly sized, (2) it does not leak substantially, and has either (3a) proper air handler fan flow, and proper plenum static pressures, or (3b) proper room and return air flows, and proper plenum static pressures.
For installation inquiries and assessments, please write to info@blueboxengineering.com. |
上海蓝箱机电设备工程有限公司提供空调制冷设备的安装服务。我们从设备设计选型开始,完成设备安装、设备调试,直到设备维护保养。
|
|
|
|
Computer Rooms
计算机房 |
Decoration Materials Mart
九星装饰材料市场 |
Hua Dong Hospital
华东医院 |
|
|
|
KOSTAL
科世达工厂 |
Lakeside Resort
江苏望湖岭山庄 |
New Concept Building
新概念大厦 |
|
|
|
Shanghai Ming Hang District Procuratorate
上海闵行区检察院 |
Ramada Hotel
华美达大酒店 |
Schattdecor
德国夏特工厂 |
|
|